Important MCQ questions for GATE, ESE Engineering Service Examination, IES, PSU Examination and Study Material For Electrical and Electronics Engineering in Circuit Theory, Network Theory, Material Science, Power System, Control System, Measurement, Power Electronics, Transformer and Electrical Machine, Control System, EMT, Power Electronics, Microprocessor and Communication System.
When is the READY signal sampled or checked by the 8085 microprocessor?
A)At the end of each machine cycle
B)At the 2nd state of every machine cycle
C)At the end of each instruction cycle
D)At the 1st state of every machine cycle
Answer : B) At the 2nd state of every machine cycle
No comments:
Post a Comment